| View previous topic :: View next topic |
| Author |
Message |
subzero 5th Storey

Joined: 09 Apr 2007 Posts: 57 :
Items
|
Posted: Wed Mar 31, 2010 1:11 pm Post subject: Hacking of wall between MBR & Bedroom 1 |
|
|
Hi, just wanna ask if any of you had hacked an opening between the MBR & BR1?
If yes, is there any requirement by HDB that the whole wall must be hacked down before building part of it back?
Or can just hack a portion of the wall to create an opening?
Any problem with sealing off the BR1 door also? |
|
| Back to top |
|
 |
gaz0307 15th Storey

Joined: 29 Mar 2009 Posts: 280 : Location: Pinnacle@Duxton
Items
|
Posted: Wed Mar 31, 2010 7:26 pm Post subject: Re: Hacking of wall between MBR & Bedroom 1 |
|
|
If hack, why not hack everything?
Anyway, I don't think it should be a problem as long as HDB approve and with any hacking, HDB must be notified.
I know for a fact that there should not be a problem sealing off doors as we already sealed off our Master Bedroom door..
| subzero wrote: | Hi, just wanna ask if any of you had hacked an opening between the MBR & BR1?
If yes, is there any requirement by HDB that the whole wall must be hacked down before building part of it back?
Or can just hack a portion of the wall to create an opening?
Any problem with sealing off the BR1 door also? |
_________________ http://passingmomentos.wordpress.com/
alpha-200|100mm F2.8Macro|18-70mm F3.5–5.6 |
|
| Back to top |
|
 |
fftw 15th Storey

Joined: 02 Feb 2009 Posts: 207 :
Items
|
Posted: Wed Mar 31, 2010 9:43 pm Post subject: |
|
|
| You need to ask your contractor or ID to get a permit from HDB for the hacking. All walls except the bathrooms are hackable |
|
| Back to top |
|
 |
subzero 5th Storey

Joined: 09 Apr 2007 Posts: 57 :
Items
|
Posted: Thu Apr 01, 2010 12:47 am Post subject: |
|
|
appreciate yr advise. i know HDB permission must be sought before hacking the walls and also which walls are hackable.
but what i am trying to find out is that whether HDB allow us to just straight away hack an opening in the wall or need to hack away the whole wall and later make back the wall to have an opening? |
|
| Back to top |
|
 |
Galatian 35th Storey


Joined: 29 Apr 2005 Posts: 1399 : Location: Cantonment Rd
Items
|
Posted: Thu Apr 01, 2010 8:04 am Post subject: |
|
|
You need to seek permission from HDB, together with supporting documents ie; (drawings) on what you want you want to do to the particular wall. Your ID should be in a better position to advice you on this. _________________ Do not go where the path may leads, go instead where there is no path and leave a trail - Ralph Waldo |
|
| Back to top |
|
 |
superman Ground Level

Joined: 17 Jan 2007 Posts: 40 : Location: Singapore
Items
|
Posted: Thu Apr 01, 2010 8:34 am Post subject: |
|
|
| you can hack a wall partially. what Galatian said applies, and your ID/contractor will know what to do. |
|
| Back to top |
|
 |
dXter Moderator


Joined: 15 Apr 2005 Posts: 3393 :
Items
|
Posted: Thu Apr 01, 2010 9:22 am Post subject: |
|
|
I tried to hack my walls partially (make a hole), but HDB engineer insisted on hacking from the ceiling down before he will approve the permit which I eventually did. Hacked from ceiling to about 80cm from floor. Then had to patched up the hole with partition boarding. My feel is you will need to discuss with the engineer assigned to your case, no point asking here. _________________ http://www.liquidgeneration.com/quiz/images//Card_Fett.jpg
http://www.msu.edu/~whitero2/capn/sw20.jpg |
|
| Back to top |
|
 |
eq 15th Storey


Joined: 20 Feb 2005 Posts: 221 : Location: High Up There
Items
|
Posted: Thu Apr 01, 2010 10:04 am Post subject: |
|
|
| I hacked only a door way from MBR to 2nd BR, dun need to hack whole wall or all the way to the ceiling... |
|
| Back to top |
|
 |
subzero 5th Storey

Joined: 09 Apr 2007 Posts: 57 :
Items
|
Posted: Thu Apr 01, 2010 5:51 pm Post subject: |
|
|
| eq wrote: | | I hacked only a door way from MBR to 2nd BR, dun need to hack whole wall or all the way to the ceiling... |
u mean HDB approve what you had done? PM me if not convenient. |
|
| Back to top |
|
 |
eq 15th Storey


Joined: 20 Feb 2005 Posts: 221 : Location: High Up There
Items
|
Posted: Fri Apr 02, 2010 12:28 am Post subject: |
|
|
| subzero wrote: | | eq wrote: | | I hacked only a door way from MBR to 2nd BR, dun need to hack whole wall or all the way to the ceiling... |
u mean HDB approve what you had done? PM me if not convenient. |
Yup... I even move my MBR door frame further up to create more space in MBR so that I can hack a door way at the 2nd bedroom. btw, we had sealed up the 2nd BR orignal doorway...
I believe ur ID juz need to submit the application...  |
|
| Back to top |
|
 |
| |
|